Seasonal Electric Charge System of Industrial-use |
(per kw)
|
Electric Power Type
|
July, August
|
April, May, June, September
|
October
~ March
|
Yearly Average (Including
VAT)
|
Low Voltage (220V, 380V)
|
63.80 won
|
48.10 won
|
51.90 won
|
58.87 won
|
Type I for Selection
|
High Voltage A
|
63.50 won
|
48.00 won
|
51.40 won
|
58.52 won
|
High Voltage B
|
62.60 won
|
47.20 won
|
50.60 won
|
57.62 won
|
Type II for Selection
|
High Voltage A
|
60.10 won
|
44.60 won
|
48.20 won
|
54.79 won
|
High Voltage B
|
59.40 won
|
43.90 won
|
47.50 won
|
53.99 won
|
|
|
|
¢º
Type I for Selection : Save electric charge by
selecting this when equipment |
|
¢º
Type II for Selection : Save electric charge
by selecting this when equipment |
|
¢º
High Voltage A : Consume more than 3,300V but less
than 66,000V of voltage |
|
¢º
High Voltage B : Consume 154,000V of voltage supply
|
|
¢º
For electric boilers, single-phase current
instead of three-phase current, and |
|
220V instead of 380V or 440V, save
more money in terms of interior wiring costs |
|
|
and are more trouble-free. Hence,
the higher voltage is the better. |
|
¢º
Cost of increasing electricity : In
case of increasing electricity by about |
|
20kw. (Internal wiring costs is
charged extra.) |
|
|
Underground supply
region - approx. 100,000won/kw |
|
|
Electric pole supply
region - approx. 90,000won/kw |
|
|
|
|
|
|
¢Ã
Electric Charge Chart |
(Including VAT,
avr. charge per year, as of May, 2001)
|
Charge
Type
|
Regular
(low pressure)
|
Educational Purposes
(low pressure)
|
Industrial Purposes
(low pressure)
|
Agricultural
Purposes
(low pressure)
|
Standard Charge
(per kw)
|
5,896 won
|
5,478 won
|
4,565 won
|
920 won
|
Chare by Usage
(per kw)
|
77.53 won
|
64.60 won
|
57.88 won
|
28.71 won
|
|
|
|